日韩在线视频一区_av在线官网_亚洲热在线视频_美女搞基直播_中文在线一区_91精品电影

Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

主站蜘蛛池模板: 一级毛片日本特黄97人人 | 日韩精品一区二区三区视频播放 | 亚洲一区二区三区影院 | 欧美调教视频 | 亚洲综合久久久久久888 | 国产日韩精品一区 | 亚洲电影免费观看高清完整版在线观 | 国产在视频一区二区三区吞精 | 日韩一区二区在线观看视频 | 国产淫语对白在线视频 | 久久99精品视频 | 亚洲网站在线观看 | 好吊在线视频 | 夜夜久久 | 一区二区三区免费视频 www | 精品91久久 | 草草线在成人免费视频 | 中文字幕日本亚洲欧美不卡 | 99久久久国产精品免费99 | 亚洲一区国产视频 | 日韩免费精品一级毛片 | 黄色国产视频 | 天天操网| 亚洲热视频 | 成人免费久久精品国产片久久影院 | 国产精品视频1区 | jizzjizz日本护士视频 | 国产一级大片 | 91网址 | 91视频h | 久操免费在线视频 | 天天综合色天天综合 | 婷婷丁香综合 | 日韩免费一区二区 | 国产综合在线视频 | 日韩中文一区二区三区 | jdav视频在线观看免费 | 欧美国产高清欧美 | 久久国产精品一区二区 | 亚洲9777精品毛A片久久久 | 久久艹逼 |