日韩在线视频一区_av在线官网_亚洲热在线视频_美女搞基直播_中文在线一区_91精品电影

How to keep high production rate of screw pump

Date of issue:[2020-08-17]     Click through rate:    

Screw pump is the most commonly used mechanical oil extraction method in the world, and its most common operation problem is that the pump can not be fully filled, resulting in low productivity. The incomplete filling of pump is due to the pump capacity greater than the well output or the poor gas separation at the pump inlet, and part of the pump displacement is lost due to the interference of gas in the pump and the control of the pump operation time, so as to make the pump displacement and flow Matching the amount of fluid entering the bottom hole can improve the efficiency and reduce the cost. The specific methods to maintain the high production rate of screw pump are as follows:

1. Sound wave liquid level measurement should be carried out to determine the relative depth between the production liquid level and the pump suction inlet. If the liquid level is higher than the pump suction, it is impossible for the well to produce at maximum production. If the gas interference affects the production rate, the liquid level is higher than the pump suction; if the pumping volume is too large to cause low production, the liquid level should be at or near the pump suction.

2. The motor power and indicator data can be obtained simultaneously by using the comprehensive data acquisition system. One of the main uses of indicator diagram is to diagnose how the pump works and to analyze downhole problems. The application of production liquid level measurement combined with indicator diagram can be used to know whether the well is producing at the maximum production rate, whether the liquid column height is higher than the depth of the pump inlet, whether the pump is not fully filled and whether the free gas migrates upward along the casing annulus.

3. Diagnosis of low energy efficiency wells. The diagnosis method is to determine the total efficiency of the pumping system, which only needs to measure the input power of the prime mover, determine the bottom hole production pressure and accurate production test data. Generally, the total efficiency of beam pumping system should be about 50%. If it is lower than this, its performance should be improved. Techniques to improve total efficiency include maintaining high volumetric efficiency (matching pump size with wellbore injection volume, eliminating gas interference, controlling pumping with a pumping controller or timer) and replacing excessive motors.

4. Downhole gas separation. Invalid pump operation is often caused by air interference, which can be diagnosed by acoustic liquid level measurement and indicator diagram. It is best to place the pump suction at the bottom of the fluid into the zone, if placed above, gas separator should be used. If the valve seat nipple is arranged at least 10ft below the bottom of the fluid entry section, effective gas separation can occur in the annulus, and the casing acts as the outer cylinder of the separator. However, the conditions of the well often do not allow the pump to be placed below the fluid entering layer, so downhole gas separator should be considered. The conventional gas separator is composed of fluid entering part (such as perforating nipple), outer cylinder (such as a section of tubing with plug at the bottom) and liquid sealing pipe at the bottom of pump.

5. The displacement of the pump can be controlled by adjusting four parameters: plunger size, stroke length, pump stroke number and daily operation time. Due to the high cost of pumping equipment, the pump with inappropriate size is not usually replaced. The simplest way is to change the configuration of the ground equipment, such as moving the beam rod to change the stroke length of the ground and the pump; the second is to replace the motor pulley to control the pump stroke number. The matching problem of pump volume and well productivity can be realized by changing the daily operation time. The following devices can be used to control the operation time: air pumping controller, interval timer and percentage timer. If the air pump controller detects that the pump is not fully filled, it will stop the pump. The timer controls the running time of the pump, which is cheap and easy to operate. The duration of pump stop should be short to the bottom hole production pressure rise no more than 10% of the reservoir pressure. The operator can measure the above acoustic wave and indicator for each well within 45min to determine the well productivity, downhole pump performance, downhole gas separator performance, sucker rod and beam pumping unit load and motor performance. Through the analysis of 45min, the operator can make the well production maximum and reduce the operation cost.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

主站蜘蛛池模板: 国产精品久久久久久久网站 | 国产麻豆 | 日本看片一区二区三区高清 | 成人国产网站 | 国产午夜精品福利视频 | 久久不卡一区二区三区 | 在线色网站 | av毛片在线免费看 | 精品久久久久久久久久久久久久 | 欧美大片一区 | 特级av毛片免费观看 | 欧美人与禽性xxxxx杂性 | 欧美片第一页 | 国产成人无码区免费内射一片色欲 | 免费a视频在线观看 | 久久99综合国产精品亚洲首页 | 操美女在线 | 精品美女在线观看视频在线观看 | 久久久婷婷一区二区三区不卡 | 日本无码成人片在线观看波多 | 免费a级在线观看播放 | 亚洲午夜精品A片久久WWW软件 | 大伊香蕉在线观看视频 wap | 亚州中文| 欧美在线视频一区二区三区 | 91tv在线观看 | 热99在线 | 日韩欧美片 | 97国产精品 | 精品性久久 | 天天插天天干 | 成人av一区二区三区 | 亚洲精品久久久久影院 | 日韩亚洲视频 | 色视频网站在线观看 | 999成人网 | 蜜臀在线免费观看 | 欧美的| 哪里能看毛片 | 久久中文字幕网 | 婷婷香蕉 |